As Kai put it, today was our first day doing some actual construction. Not quite true, but I know what he meant. It was our first day actually building a feature of the golf course. We are filling the greensite on Hole 6 with sand, and at the end of the day we’re half way home with that job.

Good news on the machine front as well. We’ll be adding another dumper and a D6R bulldozer to our D6N. This machine will be used for stripping areas of topsoil, organic material, and building tees. The D6R is a fair bit more powerful.
















Racing home. It’s 21:45 when this was taken, and the operator is putting the D6N away after a long day’s work.