Wednesday, March 8, 2023

14-Years After. Restoring the Bunker Left of 3 Green



Sand had been raked up the face of the greenside bunker on 3. 
This allows grass to encroach easily. Restoring the lip of the bunker will help halt that problem, and give this flattish bunker more structure.


 

Tuesday, March 7, 2023

14-Years After: Restoring the Greenside Bunkers on Hole 2

The greenside bunkers after edging in 2009.

Bunker edging from 2009.

The face of the bunker is pretty much intact, but
grass has grown down the sides and around the back of the bunker.
Unfortunately, I didn't take photos after the fact as we zipped through the course in 14-days, addressing all the bunkers and critical waste areas. After I'd left, sand was raked out to perfection.

Not a lot of work to be done here.
A bit on the face, and removing about 50 to 70cm of grass that has encroached at the back of the bunker.

 

Monday, March 6, 2023

14-Years After. Restoring the Bunker Forms at Sand Valley

Having edged all the bunkers at Sand Valley personally, I have a really good recollection of what once was... but even the best memories fade. Fortunately, the bunkers had been photographed during construction, while edging and after sand installation in 2009. They're invaluable reference material.

This bunker fronting the 2nd green demanded the most work. One can see how the back of the bunker shrunk over time, creating an odd looking berm as grass grew into sand that piled up there.

The face of the bunker, built from silty material, also lost its concave form. Much of the work in this area is raking down sand that has piled up on the face over the years, followed by re-edging.


The Jaskot Brothers aka Bunker Brothers with Sonya during sand installation in 2009.

How the bunker looked after being edged in 2009.

The original edging from 2009. Before sand installation.

2023... Let the work begin!!!


Removing sand buildup and trying to find an edge.
This is the one bunker, due to the silty material it was constructed from,
that lost a significant amount of its form.

Removing the sand berm, and restoring the back edge of the bunker.


 

Thursday, July 24, 2014

Congratulations to Berni Reiter 2014 LOTOS Polish Open Champion

Three rounds at -10 makes Bernie Reiter the 2014 LOTOS Polish Open Champion by 3 strokes.

Congratulations!

Scores can be seen here:
http://www.pga.de/lotos-polish-open-en/articles/lotos-polish-open-results.en.html#/competition/102289/results



Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1(909) 581-0080

Thursday, May 2, 2013

Sand Valley Lands Polish Open

It doesn't get any bigger than hosting the National Open.

When designing and building Sand Valley, this wasn't something I thought of or considered. You usually expect these tournaments to go to major population centers, not a town of 12,000.

The only job, like all projects, was to protect the investor by leading construction daily, seeking every opportunity to communicate and refine the project in real-time. It's as Kai Hulkkonen stated, published in Rescuing Sand Valley, Paul Daley's book Golf Architecture a Worldwide Perspective Vol. 5:

Specifically, he clearly sees how daily involvement by the architect is a tremendous driving force, especially in an emerging golf nation and continent where golf course builders are a scarcity. He believes an architect leading construction daily provides “something really valuable for product quality” because continual assessment and improvement of strategic value and the creation of special details makes “stuff look just stunning, yet does not cost all that much to build; details just not possible on a turn key project”. 

How much time was dedicated to designing and constructing Sand Valley?
Here it is... Sand Valley by the Numbers:

·   Total Schedule: 483 days. This includes Saturdays and Sundays.

·   Number days I worked: 457 (days missed were due to bad weather)

·   Number of hours worked/day on average: 11 hours (as documented in my Daily Design/Construction Diary)

·   Total Hours: 5000+

It is the rarest of commitments in the history of golf course architecture... it is typical of my services to my clients, and what they rightly deserve.



Polish Open sponsored by LOTOS update:

The winning score was -9 by Florian Fritsch. Congratulations!

Special mention must be given to the sponsor LOTOS for putting on a first rate event, and club president Marek Majewski for helping bring the tournament to Sand valley.

Monday, November 8, 2010

Final Touches on Sand Valley's New Hell Bunker








Before.









After.

A rainy November 8, 2010, the new "Hell" bunker is completed.











Before.










After. The soil pile to the left will be spread about in the coming days.











Hell Bunker in its ancient unraked form. Notice the left is lower than the right; ours is reversed.














Hell Bunker in 1950.















Today, Hell Bunker is a barely recognizable from its original form.









Today I was up a little earlier, 05:00... and on the course setting the grass clumps in place an hour later under the lights of a utility vehicle. Not long after it stared raining again, as I was trying to get some shots to document the conversion.

I think it looks pretty good, and adds another dimension to the hole... entering the player's mind on the tee shot. One thing is certain... nobody will be losing their balls here anymore.

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080
+1(909) 581 0080 begin_of_the_skype_highlighting

Sunday, November 7, 2010

Final Day of heavy lifting at the New Dune Bunker


The bunker is completed, the grass clumps placed about the bunker and atop the sand. Tomorrow I'll set them in the sand and make any needed adjustments.


I had no idea exactly how this bunker would turn out, but it looks a little like a version of Hell bunker at St. Andrews Old, but in reverse. It wasn't planned that way, like everything else at Sand Valley, it simply evolved.

We cut slabs of sod from the bank of the 7th fairway extension and used them for the back of the bunker and one small section of bunker face and drove sand until noon. Then I let the guys go, figuring I'd tie-in the back of the bunker to the fairway before calling it quits too. Just as I was going to tie-in the outer banks, the bunker rake died, so I took some pieces of sod stockpiled during the first days and placed them about the bunker.

Later I joined some members for a few holes and got to look at the bunker with fresher eyes, and thought the grass clump placement looked pretty good. Tomorrow I'd set them in place.

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080
+1(909) 581 0080 begin_of_the_skype_highlightin

Saturday, November 6, 2010

Sand, Sand and Rain








Where we started from in the morning. A layer of new sand can be seen in the distance.







Where we got to before it was too dark to continue. This photo was taken the next morning.









Today we continued driving in the sand. Unfortunately the dumpers couldn't get close to the bunker, even though the fairway is 1.2 meters of pure sand, so the loader had to make 200 to 250 meter runs.

We drove all day, and once it got dark at 16:30 called it a quits... as I couldn't see where to spread the sand. We got most of it installed and it's starting to look like a bunker.

Getting sand up the 3 to 4 meter bunker face was fun...

Thanks Guys... great job.

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080
+1(909) 581 0080 begin_of_the_skype_highlighti

Friday, November 5, 2010

More heavy lifting on the Dune Bunker









Sketches to Tomek, the excavator operator on how to tie the bunker into the Hillock.












Tomek working on the area illustrated. This is the last bit of scraping before sand is driven in.





Today we finished the scraping out of the bunker, and in the evening began driving in sand.

Funny, but at 18:20 the loader died again, and well, it seems the battery was weak and with so much electronics in the system, the lights sapped the battery's energy and we were all left in the dark for a second night.

So it wasn't the soccer game after all! :)

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080
+1(909) 581 0080 begin_of_the_skype_highlig

Thursday, November 4, 2010

Grunt Work at the Redesigned Dune Bunker


The bunker as it looked after Day 1; Day 2 just underway.



Today was a day of heavy lifting. We're using a loader to drive material out, luckily the soil is going a short distance for the extension of the start of the 7th fairway.

It was a miserable day, pissing down pretty much the whole time, but lucky for us it never turned into a heavy rain. Strange though, at 18:00 the loader died on us... just in time for the EUFA Cup soccer game. Guys!?











Scraping out the bunker at night.




Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080

Wednesday, November 3, 2010

Returning for Some Refinements.








The original Dune Bunker as it looked after the course opened.

Today we started peeling away the "Dune" before the 6th green in an effort to convert it into one big bunker.

The problem is this dune had grown too thick and wasn't the easiest to maintain. Being on the line of play for those who bail left from the tee, it swallowed many golfers shots, and resulted in lost balls. So... enter a bunker.

I'm not sure how the bunker will look like in the end, but I know it'll be big.


Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1(909) 581 0080

Friday, January 1, 2010

Clip from CNBC on Sand Valley


From CNBC while the project was under construction.
Yours truly at the 3:26 mark.









A view of Nr. 12, The Quarry, a short par-5 of 485-meters.


Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1(909) 581 0080

Saturday, August 22, 2009

The hands of a true Hands-on Golf Course Architect

One of the most abused claims in the business is "Hands-On" golf course architect. The term now has been dumbed-down to the point where a few site-visits during the project, driving around in an air conditioned truck, and barking out design changes to work completed according-to-plan is hands-on.

It used to mean the architect spent months on-site and was actually involved in the construction, making improvements to the course as, or even before features were being built.

Below are the hands of a true hands-on architect... yours truly. The product of long days with my girlfriends... the shovel and rake, creating the individual bunker forms that set Sand Valley apart.

The left hand looks like it used to when I hit a couple hundred balls a day as a tournament professional... so I've included the right hand too... which has the same three mountains of calluses... which I call Mt. Everest, K2, and Zugspitz.
















Back in the old days as a tournement professional my left hand used to look like this from hitting hundreds of balls a day.





















But not the right hand... unless I had hit hundreds of balls left handed on a daily basis.

Now these calluses are the product of crafting special golf courses... building them one-at-a-time, being on-site all-day... everyday... in the old and fullest meaning of "Hands-on".

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1(909) 581 0080

Friday, August 21, 2009

Links Golf? Not so fast!!!

Just to be on record, Sand Valley is not a "Links Course" or an imitation links. Elements from the links have been stolen, that is for sure, but what was taken from the links is the heart and soul. Not the aesthetics.

Honestly, I cannot tell you what type of golf course Sand Valley is. She is schizophrenic. Has multiple personalities. There are holes through forest, in open rolling spaces, along the river, paralleling the rail line, holes with wetlands, with ravines, along ledges, in an abandoned quarry, and through river dunes.

You tell me... anything but Links... please.

Is she modern?
Is she classic?
It will be interesting to hear the opinions.

The following format is from another course I had designed and was written about in 2000, it has been adapted for Sand Valley because it fits here too:

Links Golf? Scottish Golf?

This course is not meant to be a Links-type course. To call it one would be a severe misrepresentation of fact, as most courses marketed as Links-type are.

This course is designed in the spirit of those timeless inland designs from the Golden Age commonly found in America, Canada, England and Australia. Like the Golden Age designs and architects, elements and ideas were adapted from Links Golf; the heart and soul, but not the cosmetics. Modern construction equipment has allowed us to take some liberties in land alteration at Sand Valley that wasn't so easily executed 70-years ago, but the ideas we stole from Links golf are:

1. Wide Fairways. This allows all classes of golfers to enjoy the game, and if the course is hard, fast and windy, the most interesting conditions to play golf, there is room to play. It allows for a whole spectrum of strategies, and as the hole location changes, firmness of ground changes, wind changes direction... often the case at Sand Valley, as there is no prevailing wind, the line of attack changes too. This keeps the game interesting... ideally mystical for years to come.

2. Random, natural bunkering. Placing bunkers for "better players" looks artificial, is a modern occurence and sucks the fun and interest out of the game for many. Ours eat into the fairways, and as some fairways are huge, double most modern courses, bunkers are placed towards the middle.

3. Interesting greens and surrounds. The short game is over 65% of golf. A short accurate hitter with an excellent short game can beat a long hitter with a poor short game on this golf course... guaranteed.

4. Hard and fast conditions are the hallmark of Links golf. By good fortune the native soils are suited for these conditions. It truly is a gift of nature. Some courses have paid millions and do not have the optimal conditions we enjoy... naturally.

5. Greensites which allow bounced in approaches. Our firm fairways permit this, and this allows the weaker players to attack the holes using the ground. Most golfers simply don't hit the ball high enough, or spin it enough to play loft-and-drop golf.

The better players at times will have to choose between bouncing their approaches in, or trusting an aerial attack. It is something sure to cause indecision for them, which is great... anytime you can get between the ears of the expert and cause indecision, you've accomplished something.

6. Affordable maintenance practices. True Links are cost effective to maintain (something faux Links usually aren't), and so is Sand Valley. Do not expect Japanese Garden conditioning, this would defeat the design-intent. Expect the golf course turf to be managed for playing conditions... not color... just as they do on the Links.

This doesn't make Sand Valley a Links Course, anymore than piling up dirt alongside the fairways and building grass-faced or sod walled bunkers qualifies a course as "links-type"... but it does mean Sand Valley has some of the best qualities of the Links, minus the most visual aspect... the sand dunes.

If you would like to read the full length version of the document used as the template for this post, click here:
http://www.scribd.com/doc/5039150/Understanding-Der-Golf-Club

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080
574

Thursday, August 20, 2009

Nr. 7 Again Before and after Looking Down the Fairway

Fairways 6 and 7 were capped with sand... about 1.2 meters worth, and then shaped. What was filled was a triangular area about 300 meters at its base and 150-meters at its sides. The bank to the right of the fairway reveals the amount filled.

No plans were used to create one of these contours, they simply evolved while sitting on the bulldozer. Every roll and hollow, hump and bump is man made.

Originally the area was to be capped with clay, and if you look close you can see a pile of two the previous company delivered. After my arrival we switched to capping the area with sand. It saved installing kilometers of drainage, and all the problems that result from using this inferior material.

We trucked out almost all the clay material brought in, except for a pile that was near the turning point on the 6th. That served as the spark for the ledged/split fairway concept on 6... the high point of the two fairways.

Had we used clay, we still might be trying to finish this hole! In the summer of 2007 we had constant rain, the longest dry stretch being 10 days, and the clay... even if properly sealed would have been an ordeal to shape, drain, install irrigation, cap with topsoil and seed. I say "properly sealed" because not one delivery of material to a greensite, fairway or tee was properly sealed... in the end it didn't matter because all the work the previous company had done delivering material was trucked away.

























































Wednesday, August 19, 2009

Hole Nr. 2 Before and After

Before my arrival, the previous builder spent 10-months making construction error after construction error unhindered. Here they stripped the greensite of organic material and pushed it to the tees as fill for the third hole... a construction "NO-NO". It was one of many that filled 11-pages after my 4.5 day walk through of the property before taking the project... and I still didn't catch them all! All this will be documented in the upcoming book Sand Valley, It's Design, Construction & Future.

This greensite fortunately wasn't mismanaged, but proved to be an interesting adventure, it was a product of evolution, seizing on unforeseen opportunities. Had it been a project that followed plans, the opportunities would have been missed, and the greensite less beautiful because of it.

















Before.
















After. This greensite took the longest to shape, for a whole host of reasons.

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080

Tuesday, August 18, 2009

The Bunker Brothers

These are the two best workers Sand Valley has seen... Period.
They have also been doing one of the toughest jobs... day-in and day-out.















The Bunker Brothers, Maciej (L) and Marcin Jaskot with our Mascot Sonya.


  • They don't take extended breaks.
  • They don't sit around picking their noses when finished their work... they find more!
  • They don't waste time in the thousands of possible ways.
  • They never complain.
  • They don't sit around talking like old ladies.
  • They arrive early for work and are ready to go when it's time to go to work.
  • They ignore bad influences... guys not doing their jobs.
  • Because they work hard and do a good job they don't require baby sitting.
  • They take instruction well.
  • They are in good spirits.
  • They elevate standards, because they make the efforts of most others look meager.
You could never have too many like them.

If someone is ever looking to hire these guys... don't hesitate.
They have my 100% recommendation.
My bet is if they don't have the skills needed, they will learn them.
Their computers seem to be wired that way. To perform.

Thanks guys, for giving me one less thing to worry about.

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080

Monday, August 17, 2009

Sand Ahoy!

Today 6 bunkers were filled with sand. Two bunkers by green 2, and four fairway bunkers on the 4th. It would have been more, but the Bunker Brothers, Maciej and Marcin Jaskot were busy this morning cleaning out a bunker before installing sand. Sounds easy... it wasn't.















Sand installed. No sand pro to be used in these bunkers. It is actually much faster to rake them out by hand. In a previous thread I called these "The Three Bears", but they're really part of "The Bomb Garden".

Bomb Garden references in this blog:
Piecing Together Nr. 4
Design on Land, Not on Paper

4 Bunkers on 4

Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080

Sunday, August 16, 2009

7th Greensite Development Progression in Photos

The bunker fronting the 7th green has taken the longest time to bring to completion. I began this work on July 5th, and have worked on it on and off. That's the value of having time to reflect.
July 5 Blog entry: Sunday Spent Edging

Though I liked the general idea, was never happy with the state if things, so... today was another attack.

The Bunker Brothers were doing the hard work of cutting and hauling in the sod slabs, and I spent the day placing them.

Finally I'm satisfied.
















This is what the 7th greensite looked like upon my arrival at the end of April 2007.

















The greensite has been shaped, the bunkers and hillocks.
That's Chechek Chechek in the bunker, showing its depth.
















Edging lines have been loosely marked, and the first bit of edging work underway.
















This, and the remainder of the photos were taken today.













































Tony Ristola
agolfarchitect.com
agolfarchitect@yahoo.com
+1 (909) 581 0080