Thursday, November 4, 2010
Grunt Work at the Redesigned Dune Bunker
The bunker as it looked after Day 1; Day 2 just underway.
Today was a day of heavy lifting. We're using a loader to drive material out, luckily the soil is going a short distance for the extension of the start of the 7th fairway.
It was a miserable day, pissing down pretty much the whole time, but lucky for us it never turned into a heavy rain. Strange though, at 18:00 the loader died on us... just in time for the EUFA Cup soccer game. Guys!?
Scraping out the bunker at night.