Tuesday, September 11, 2007

Slopping It Up

Digging the constructed wetland down the right of 4 continues.

The material excavated and transported by dumper to The Wall behind 4 green has been sitting for a few days and remains wet. Too wet to be pushed all the way by bulldozer (we need to make more room) so today one bulldozer pushed material to the excavator who then piled it up high on the wall. It’s double the cost of handling dry material, but necessary to make space for more sand.

Tony Ristola
agolfarchitect.com