The first attempt went undocumented. Those responsible for the engineering and installation of the pump station sized the crane wrong and we had to stop. It just couldn’t lift the 12 and 15 thousand kilo masses of concrete and place them into the 3 meter deep hole. With the machines necessary to complete the job, the two sections of pump station are in place and ready for the next steps to be performed.