Yesterday Chechek our stripper (of topsoil) went into greensite 4 to do peel away the organic material and got stuck. That ended his stripping in that area.
Today we had one of excavators go in and scrape it out and pile it out of the way. The back of the greensite had a thin 15cm (6 inch) layer of topsoil, but the front, where Chechek got stuck, was at least 1 meter (3 feet deep) of peat type topsoil. Now we have to go back and fill in the 20 by 10 meter crater with sand.
Tony Ristola
agolfarchitect.com
+1 (909) 581 0080