Tuesday, June 5, 2007

Lake Excavation Day 1

This is our first full day at excavating the remainder of the lake. The start, less than half the excavation was completed by the previous construction company, and they left us with a couple challenges.

1. All the water bordering our excavation and…
2. They did not dig to the prescribed depth. Our side of the pond must make up for this deficiency.

The day went well, the hauls are short, and the material and weather cooperative.













To the left of the water is a short, brighter green vegeatation where the topsoil has been removed. This entire section need be excavated to bring the water feature to its full size; about 150 meters by 40 meters by 2.5 meters deep.